Home >PROJECT REFERENCES > Power Plant for Nubaria Cement

Power Plant for Nubaria Cement

The Power plant consists of 3 nos. of DG’s of rating of 8MW for powering up the NUBARIA CEMENT Plant in Egypt.  The Engines are of make Niigata Power system and the alternator was sourced from STX Heavy Industries in Japan.

The Plant was designed so as to use Diesel and Heavy Fuel Oil (HFO) as the main fuels for running the plant.

The Complete plant was erected and commissioned by the established Korean Contractors Dae Dong and the Operation and Maintenance of the Plant for the next 10 years is part of the Original Contract.

The Plant capacity is around 20 MW and  produce around 15 Million Unit of Energy every year.

Vollwert   has supplied following equipments for the Project.

  • MV Panels.
  • MV Transformer
  • LT Panel for the DG Auxiliary.
  • DG synchronisation System.
  • Substation Automation package with PLC and SCADA
  • Instrumentation package for the Complete Power Plant.